The Block••1 min read
New Texas power grid allocation framework could lift bitcoin miners turned data center operators
The Signal TakeBullish
The Electric Reliability Council of Texas says data centers account for nearly 90% of the 438 GW of large-load demand in the state.
📱
Never miss a Web3 update
Join our Telegram channel to receive news in real-time, straight to your phone.
Related News
S token drops 5% as 3 former execs resign from Sonic Labs board
Cointelegraph•6h ago
Schwab to join prediction markets race with S&P 500 event-based options: WSJ
CoinDesk•13h ago
TD Cowen says CME has the upper hand in lawsuit against CFTC over crypto perpetual futures
The Block•14h ago
The 5 Largest Publicly Traded Solana Treasury Firms
Decrypt •14h ago